Samuel Beckett Bridge (Droichead Samuel Beckett)

Construction commenced in May 2007 and the bridge opened to traffic on the 11th December 2009. For details of scheduled opening times (when the bridge is closed to pedestrian and vehicular traffic) see; https://www.dublincity.ie/residential/transportation/samuel-beckett-bridge

Find Your Bearings

More Locations

Close Search Window